The Survey of Data Centres need Importent Information for Basic Design to Match Customer Need and Goal of New Data Centres
Type of Survey | Type of Data |
---|---|
Informamation Gathering | Overall Data Center Layout and Space Utilization |
Current Physical Infrastructure System | |
The Current Objectives of Data Center | |
Future Requirement of The Data Centres | |
Key Phisical Infrastucture features and capabilities needed to support the Current and the Future Goal for the Data Centres | |
On Site Evaluation | Overview Conduct Visual Inspection of the Existing physical infrastructure to ecvaluate : 1. Overal Layout and Space Utilization 2. Thermal Management 3. Power Distribution System 4. Cabling 5. Cable Routing Path Ways 6. Racks and Cabinet 7.Telecommunication Grounding and Bonding System 8. Labeling and Administration |
Overal Layout and Space Utilization 1. Overal Size and Conditio of Data Centre room . It's Suitable for the Operations 2. Room Layout 3. Capacity for Expantion |
|
Thermal Management and Coding System 1. The Overal layout and room conditions, Including Hot Aisle and Cold Aisle Configuration, Air Suply and Return Locations, Hot Spots, and overal air flow , to and from air handling unit 2. Raised Floor Depth , Under Floor Obstruction , Perforated tile Locations, sealing of floor tile cut outs and the ability to reconfigure tiles to improve airflow 3. Drop Ceiling height , Overhead Plenum obstruction , ceiling grate locations, and the ability to adjust or reposition ceiling grates to imporve airflow. 4. The use of blanking panels, airdams , cable entry/exit , Hot Aisle/Cold Aisle , ducted exhaust system , and other airflow recirculation control methods. 5. Location , Alignment , Unobstruction airflow , and proper operations of computer Room Air Condition (CRAC), Computer to Room Air Handler (CRAH) , In Row Coolers and Others Cooling System Equipment 6. Overall Ratio of Cooling Capacity to IT Equipment Thermal Load |
|
NEXT ......
Type of Survey | Type of Data |
---|---|
POWER DISTRIBUTION SYSTEM 1. Cabinet level Power outlet availibilty, Power Outlet Unit (POU) Capacity, IT Equipment Compatibility, Redundancy , Alignment with all Data Center Tier Level , and ability to handle aditional deployment and future growht. 2. POD or ROW Level Power Distribution methodology ,access ability , Reconfiguration agility , Redudancy , alighment with all tier level and capacity for expantion 3. Overall Data Center Power System Topology , Redundancy, Tier Level, and Expandability . 4. Stand By Power System Configuration , Load Capacity , Backup Support Duration, and capability for future growth. |
|
CABLING 1. Stack management and Stand Relief 2. Bend Radius Control 3. Cable Routing and Termination 4. Cable Density 5. Cable Installation Practice 6. Labeling of Cable with EIA/TIA Standard 7. Separation of Coper data Cabling and Power Cabling 8. The Organizational Cable Structure , Topology, Bandwith of your Cooper and Fiber Optic System . |
|
CABLE ROUTING PATHWAYS 1. Patways Design and Installation 2. Cable Protection 3. Protection of Fiber Cords 4. Fill Capacity 5. Patways Support 6. Waterfalls 7. Stack Management 8. Bonding 9. labeling |
|
RACKS and CABINET 1. Space of Racks and Cabinet 2. Physical Insllation Active Equipment in rack or Cabinet 3. The Risk Physical damage of Equipment 4. Thermal Management on Rack 5. wheather cabinet and Rack Air Flow 6. Internal Bonding of Rack and cabinet 7. Support for Expandble for the future |
|
TELECOMMUNICATION GROUNDING AND BONDING 1. Room Level Bonding Practices Including Mess Common Bonding Network (MCBN, also refferd to mess BN) Construction and Connection beetwen MCBN and the Telecommunication Bonding Bacbone (TBB). 2. Bonding in the racks Cabines including Equipment Bonding jumpers, Rack and Cabinet Bonding Conductor, Busbar, Bonding Strips and Bonding Conection Methods. 3. Electro Static Discharge (ETD) protection |
|
LABELING ADMINISTRATION 1. Overall Room Labeling 2. Rack and Cabinet Labeling 3. IT Equipment , Panels and Enclosure Labeling 4. Port and Permanent Link Labeling |
|
CLIENT RESPONSIBILITY | 1. Client Povide unlimited access to data center 2. Client allow to Photograp the Conditons of Data Center 3. Client Provide any necesary information 4. Client Designated PIC for Communication |